<?xml version="1.0" encoding="iso-8859-1"?>
<rss version="0.92">
<channel>
<lastBuildDate><![CDATA[Sat, 21 Nov 2009 00:11:37 GMT]]></lastBuildDate>
<title><![CDATA[St. Louis MetroLink Rider Alerts]]></title>
<link><![CDATA[http://www.metrostlouis.org/Alerts/RiderAlerts.asp]]></link>
<description><![CDATA[These are the latest Rider Alerts for St. Louis' MetroLink Transit System]]></description>
<pubDate><![CDATA[Fri, 20 Nov 2009 18:11:37 CST]]></pubDate>
<copyright><![CDATA[(c) 2009 Bi-State Development Agency. All rights reserved.]]></copyright>
<item>
<title><![CDATA[Delays November 16-22]]></title>
<description><![CDATA[MetroLink is working on the overhead catenary wire, which powers the train. In order to conduct this work, MetroLink must operate a single track from the Belleville Station to the College Station. This single track will not affect any MetroLink platforms. The single track is scheduled to begin at 8:30PM until the end of service each day November 16-22.<br /><br />]]></description>
<link><![CDATA[http://www.metrostlouis.org/Alerts/RiderAlertsDetails-MetroLink.asp?recNum=267]]></link>
<pubDate><![CDATA[Thu, 12 Nov 2009 10:59:27 CST]]></pubDate>
</item>
<item>
<title><![CDATA[Delays November 23-25, 26-29]]></title>
<description><![CDATA[MetroLink is working on the overhead catenary wire, which powers the train. In order to conduct this work, MetroLink must operate a single track from the Belleville Station to the College Station. This single track will not affect any MetroLink platforms. The single track is scheduled to begin at 8:30PM until the end of service on the days of November 23-25 and November 27-29.<br /><br />]]></description>
<link><![CDATA[http://www.metrostlouis.org/Alerts/RiderAlertsDetails-MetroLink.asp?recNum=268]]></link>
<pubDate><![CDATA[Thu, 19 Nov 2009 09:45:59 CST]]></pubDate>
</item>
</channel>
</rss>
