MetroLink Work Scheduled August 13-17
Some MetroLink riders may need to allow a little extra time for their evening commutes next week as maintenance of the light rail system may result in brief delays for Blue Line passengers.
On Monday through Friday (August 13 – August 17) from 8 p.m. to the end of service, MetroLink will operate on a single track at the Sunnen and Maplewood-Manchester MetroLink Stations to allow crews to perform track maintenance.
- Eastbound Blue Line trains will depart 5 minutes early from the Shrewsbury-Lansdowne I-44 MetroLink Station. Eastbound Blue Linetrains will operate on their normal schedule beginning at the Brentwood I-64 MetroLink Station
- Westbound Blue Line MetroLink passengers traveling to the Maplewood-Manchester, Sunnen or Shrewsbury-Lansdowne I-44 Stations may experience delays of 5 minutes.
- Red Line MetroLink service will not be impacted.
Updates on MetroLink operations can be found at metrostlouis.org in the Rider Alert section.
About Metro Transit
Metro Transit operates the St. Louis region’s public transportation system which includes 400 clean-burning diesel buses that serve 83 MetroBus routes in eastern Missouri and southwestern Illinois. Metro also operates MetroLink light rail vehicles on 46 miles of track serving 38 stations in the two-state area, and operates Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro Transit is one of five enterprises operated by Bi-State Development.