MetroLink Work Scheduled May 21-25
On Monday, May 21, through Friday, May 25, from 11:30 p.m. until the end of service, MetroLink will operate on a single track at the Grand MetroLink Station to accommodate construction work for the new Cortex MetroLink Station.
Red Line and Blue Line MetroLink passengers may experience 5 to 10 minute delays during the single-track operation.
Updates on MetroLink operations can be found at metrostlouis.org in the Rider Alert section.
About Metro Transit
Metro Transit operates the St. Louis region’s public transportation system which includes 400 clean-burning diesel buses that serve 83 MetroBus routes in eastern Missouri and southwestern Illinois. Metro also operates MetroLink light rail vehicles on 46 miles of track serving 37 stations in the two-state area, and operates Metro Call‑A‑Ride, a paratransit fleet of 122 vans. Metro Transit is one of five enterprises operated by Bi-State Development