Road Construction in Clayton Will Impact Several MetroBus Routes Starting June 10
Patti Beck
Director of Communications
314-982-1440
Starting Monday, June 10, Forsyth Boulevard in Clayton, Missouri will be closed for construction between Wallace and Big Bend and several MetroBus routes be detoured around that area. The closure which is expected to be in place through mid-July will impact the Green Line, the #1 Gold Line, and the #2 Red Line.
The #1 Gold Line will only serve Mallinckrodt Center at Washington University on trips that begin or end at the Center. The #2 Red Line will not provide service on Wydown or Big Bend but will serve Mallinckrodt Center. The Green Line will not serve Clock Tower.
More detailed information about the reroutes is available on Metro’s website, www.metrostlouis.org or by calling Metro Transit Information Monday through Friday from 7:30 a.m. to 4:30 p.m. at 314-231-2345.
The Bi-State Development Agency/Metro (BSDA/Metro) is the operator of the Metro public transportation system for the St. Louis region, which includes the 87 vehicle, 46-mile MetroLink light rail system; 374 MetroBus vehicle fleet that operates on 75 MetroBus routes; and Metro Call‑A‑Ride, a paratransit fleet of 121 vans.
BSDA/Metro also owns and operates St. Louis Downtown Airport and its surrounding industrial business park, and the Gateway Arch Riverboats, as well as operates the Gateway Arch Revenue Collections Center, the Gateway Arch Transportation System, and the Gateway Arch Parking Facility.